Print
Published: 09 November 2017 09 November 2017
Hits: 90900 90900

Leslie Cornell Building Restoration Ltd were engaged to bring breathability back to this stone-built 18th Century end of terrace house in Liskeard.

Lime Pointing Liskeard

To limit internal damp, our works began with the removal of the existing external non-breathable cement render applications.  As a result of these non-breathable applications low level damp could be seen on the internal walls.  This was followed with the introduction of a Lime pointingapplication to all of the exposed stonework.

Lime Pointing Liskeard

To see what our Client thought about the works we carried out, please read their Testimonial.

If you have a Lime Pointing project in Liskeard you would like to discuss, please  Contact Us.

Lime Pointing Liskeard – Breathable Walls Cornwall – Damp Walls Liskeard